April 19, 2024 - Friday
Power Transmission lines

 

  v Power Distribution lines:

 

o   20 & 33 kV:

- Construction of the 20 kV overhead line of Chadormalou Dasht Sepidan wells (EPC)

- Construction of Chaghort  6 & 20 kV over head lines with the length of 70 km

- Construction of 20 kV overhead lines from Chadormalou substation to Saghand mineral complex (EPC)

- Construction of 20 kV transmission line for providing water to 10 wells of Ab dasht Sepidan-Chadormalou (EPC)

-  Construction of electrifying network to Recreational and Cultural Complex of Baghshahr, 112 hectares

- Electrification of Kowsar complex (containing 305 units)- EPC

- Procuring all equipment & execution of Yazd Dry Port internal electrification project

 

Sub- Transmission lines:

 

o   63 & 132 kV:

 

- Construction of north substation-DarvazeQoran 63 kV-double circuits telescopic overheadtransmission line

- Construction of Yazd rolling mill 63 kV-double circuit transmission line (EPC)

- Construction of 63 kV transmission line of Ardakan Gondoleh Plant (turnkey project)

- Stringing of conductor & supporter of Yazd-Mehr 63 kV, double circuit line

- Fixing (repairing) foundation of towers of north-east 63 kV transmission line

- Fixing (repairing) foundation of towers, 63 kV lines in Ringshahr of Yazd

- Execution of the variant of DarvazeQoran-Jahanabad 63 kV transmission line

- Construction of telescopic towers of Dargahan-Dargahan 2, double circuit, 63 kV transmission line (PC)

- Construction of Bafgh internal & external 63 kV transmission line in 230 kV north substation

- Construction & cabling of Gharb-Azadegan 63 kV transmission line

- Installation of 63 kV line connecting DarvazeQoran -Jahanabad line to Yazd2 400 kV substation (Turnkey project)

- EC project of the internal and external circuit of Taft 63 kV substation

- Completion works of 63 kV transmission line & substation of Abarkooh &Ardakan substation

-Full connection of two 63 kV transmission lines, & tower terminal transposition & installation of mobile substation

-Completing the semi-completed projects of sub transmission lines in Yazd

- Visual testing of sub transmission lines in Yazd province

- Painting the rusty towers of sub transmission lines (63Kv)

- Tower cold galvanizing of DarvazeQoran-Jahan Abad 63 kV transmission line

- Construction of 63 kV lines of Tarikhane Damghan

- Foundation construction of Abrisham-Garmsar 63 kV transmission line

          - Construction 63 kV connecting lines of Rastagh 230 kV substation(PC)

- Construction of Penjween-Saeed Sadiq 132 kV transmission line in Iraq (Length= 50 km)

- Construction of Anbarabad-Jahad Abad 132 kV transmission line (Length= 30 km)

- Construction of Kooshk-Bahabad 132 kV line (Length= 40 km)

- Earthing system & foundation construction & stringing 132 kV, double circuits transmission line in Tabas Substation

- Stringing & connecting 132kV lines of Harat &Marvdasht cities

-  EC project of Yazd1-Bafgh 132 kV, double circuit line (Length= 20 km)

- Preparation, excavating & installing the remaining of Harat- ShahrBabak 132 kV transmission line (Length= 90 km)

- Gabion construction of guys & the legs of 132 kV transmission line of Tabas-Eshghabad

- Installing tower steel structures of 132 kV transmission line in Tabas

- Tower erection of Bam 3- New Arg 132 kV transmission line

- Tower erection & stringing of 132 kV line in Mahshahr export harbor

- Fixing & isolation of the foundation of towers in electrical network of Yazd province

 

 

Power Transmission lines:

 

  o   230 & 400 kV :

 

            - Tower erection &foundation construction of lootak-Adimi 230 kV O.H.T.L(Length= 65 km)   

            - Tower erection & stringing of Iranshahr- espakeh 230 kV O.H.T.L (Length= 80 km)  

            - Foundation construction of Ardakan-Naeen 230 kV O.H.T.L   (Length= 110 km)    

- Transposition of some section of the main line (230 kV) of Arak2-Iralko (EPC)

- Construction of Geno-north substation (Namjoo)230 kV  transmission line (PC)

- Construction OF Rastagh connecting 230 kV transmission line (PC)

- Transposition of bays & connecting 230 kV lines in Yazd2 Substation

- Increasing the height of two towers in Yazd2-Ardakan 230 kV transmission line

- Construction of FooladArfa' 63/230 kV transmission line  (Length=20 km)

- Earthing system adjustments &foundation reformation of Qeshm 230 & 63 kV transmission lines

                           - Construction of Soormagh-Abarkooh 230 kV transmission line

- Tower erection & foundation construction of  Tabas-Bafgh 400 kV O.H.T.L  SC/3 bundle (section 3&4 / Length=143km) 

- Stringing of conductor, supporter & OPGW of Tabas Bafgh(section 3) single circuit/3 bundle, 400 kV transmission line

                            - Sorting & tower erection and stringing of Ardakan  400 kV O.H.T.L  DC/3 bundle

                            (Length=50 km) 

-Construction of  400 kV O.H.T.L  SC/3 bundle Yazd2 Isfahan powerplant (section 1 / Length=76km) 

- Construction of Armenia third line,  400 kV O.H.T.L  DC/2 bundle (section 1&2 / Length=110km)

- Tower erection & foundation construction of section 3 & section 4 of Tabas-Bafgh 400 kV, single circuit transmission line

 - Stringing of 400 kV, double circuit connecting line of Farab Powerplant

  - Completing the shortage members of tower steel structures for Ardakan 400 kV, double circuit line

  - Construction of coffer dam & levees for Tabas-Bafgh 400 kV  transmission line

  - Substitution of the universal joint in Farab 400 kV transmission line

 

  - Construction of Golgohar Sirjan 400 kV, double circuit transmission line

  - Construction of Bafgh mines 400 kV transmission line